http://industrialmanuals.com/warner-swasey-chucking-automatic-m3200-start-operators-manual-p-1837.php
Warner & Swasey 2AC Single Spindle Chucking Automatic, M-3200 Start Lot 42, Operating Instructions Manual Year (1961)
This Manual Covers Models:
2AC
M-3200
Start Lot 42
This Manual Includes:
Setting Up
Operation
tool Clearances
Standard Tools and Attachments
Preventive Maintenance
Data Sheet
Preventive Maintenance Check List
Introduction
Starting and Stopping the 0-AC Machine
Selection of Speeds and Feeds
hand operation Control
Automatic Operation Control
Tapping and Threading Operations
tooling Method On the 0-AC
Hints for More Efficient Set Ups
Standard Tool and Machine Data
2-AC Standard Attachments
Metal Removal Capacity Chart
Surface Speed Chart
Cutting time Chart
Threading Time Chart
Motor Reversal Capacity
Machine Idle Motion Constants
This Manual Has 68 Printed Pages.
Year 1961
Warner & Swasey 2AC Single Spindle Chucking Automatic, M-3200 Start Lot 42, Operating Instructions Manual Year (1961)
This Manual Covers Models:
2AC
M-3200
Start Lot 42
This Manual Includes:
Setting Up
Operation
tool Clearances
Standard Tools and Attachments
Preventive Maintenance
Data Sheet
Preventive Maintenance Check List
Introduction
Starting and Stopping the 0-AC Machine
Selection of Speeds and Feeds
hand operation Control
Automatic Operation Control
Tapping and Threading Operations
tooling Method On the 0-AC
Hints for More Efficient Set Ups
Standard Tool and Machine Data
2-AC Standard Attachments
Metal Removal Capacity Chart
Surface Speed Chart
Cutting time Chart
Threading Time Chart
Motor Reversal Capacity
Machine Idle Motion Constants
This Manual Has 68 Printed Pages.
Year 1961
No comments:
Post a Comment