http://industrialmanuals.com/pratt-whitney-borer-operators-instructions-manual-year-1935-p-5161.php
Pratt & Whitney 2A, Jig Borer Operators Instruction Manual Year (1935)
This Manual Covers Models:
2A
This Manual Includes:
Uncrating
Setup
General Instructions
Foundation Plan
General Description
Driven by a NEMA 1-1/2 HP. Three speed change gear box thru a flexible fabricated coupling
Operations of the Machine
Speeds
Feeds
Measurements
Adjustments
Brochure from July 8th 1935
This Manual Has 20 Printed Pages.
Year 1935
Pratt & Whitney 2A, Jig Borer Operators Instruction Manual Year (1935)
This Manual Covers Models:
2A
This Manual Includes:
Uncrating
Setup
General Instructions
Foundation Plan
General Description
Driven by a NEMA 1-1/2 HP. Three speed change gear box thru a flexible fabricated coupling
Operations of the Machine
Speeds
Feeds
Measurements
Adjustments
Brochure from July 8th 1935
This Manual Has 20 Printed Pages.
Year 1935
No comments:
Post a Comment